No inflated budgets, no surprise additions. Below are the real ranges we work within, with a breakdown of what drives cost in each direction.
Beyond in-hotel wellness centers, we offer four complete complex concepts — engineered, costed and ready to adapt to your land, for owners and investors.
| Concept | Format | Indicative budget |
|---|---|---|
| Ethelia One | Compact scalable wellness club, plot 1,000–1,200 m² | $1.2M |
| Ethelia Grove | Boutique wellness retreat, plot ~3,000 m² | $5M |
| Ethelia Club | Urban wellness & longevity members club, two floors | $8M |
| Atelier Longevity | Flagship clifftop longevity resort, ~1 hectare | $16M |
| Step | What happens | Cost |
|---|---|---|
| 1. Discovery call | 30–60 min video call: your idea, land, budget corridor | Free |
| 2. Idea consultation | Format recommendation and realistic budget range | Free |
| 3. Concept consultation | Layout sketches for your plot, equipment list, budget breakdown | Small fixed fee, quoted upfront |
| 4. Full design & estimate | Complete project: architecture, MEP, drawings, bill of quantities | Fixed fee, quoted upfront |
| 5. Construction | Turnkey build under one contract | 40 / 40 / 20 staged payments |
| 6. Opening support | Training, booking flow, operations setup | Included |
| Factor | Lower cost | Higher cost |
|---|---|---|
| Location | Bali (established contractor base) | Remote island (logistics premium) |
| Floor area | 200–400 sqm | 600+ sqm |
| Finishes | High-quality standard | Bespoke stone, custom joinery, signature material palette |
| Equipment origin | Quality Asian manufacturers | European premium brands (Tylö, Klafs, Starpool) |
| Cryotherapy | Electric system (lower upfront in Asia) | Liquid nitrogen, European brand |
| Float tanks | 1 tank, standard pod | 3+ tanks, premium isolation design |
| Diagnostics | HRV + bioimpedance only | Full longevity stack including VO2 max and biological age |
| Existing structure | Shell ready, good MEP access | Renovation of old building, structural upgrades needed |
These ranges reflect current construction and equipment costs in Indonesia and are confirmed against your site and equipment list before any contract. They do not include land acquisition or property rental, or any licensing fees for wellness-specific permits (we advise on these but they vary significantly by location and business structure). All equipment is specified for tropical climate operation — not European-standard spec applied to an Indonesian site.